Project Name
Rehabilitation of Sumaya Pump Station & Related Distribution Network System.
Owner
Mercy Corps.
Consultant
Engicon.
Project Period
10 months.
Description of Works
Electromechanical works for Rehabilitation of Sumaya Pumping Station including: Completion of installing and fixing all pumps and fittings,installing all Fittings on the main and sub suction and discharge lines,connection the cables with transformer, panels and pumps,connection the control cables with pumps and instrumentations, in addition to dismantling the old needless pumps and panels through the period of suspension etc.