Improvement of the Water Conveyance System from Aqeb Well Field – Stage 2.2

Feb 2018

Project Name

Improvement of the Water Conveyance System from Aqeb Well Field – Stage 2.2

Owner

Water Authority of Jordan-WAJ.

Consultant

GITEC Consult GMBH.

Project Period

462 days.

Description of Works

supply and installation of 13.8 km of ductile cast iron pipeline in diameter DN-600 mm and 300 min ON 400 mm and to connect it to existing and new pipeline sections including all valves, fittings and construction of chambers forinterconnection, air valves, and washouts; construction of a storage reservoir of 4000 m3 capacity, a chlorinating station;replacement of well connection pipelines and water meters and supply and installation of a SCADA system.