Project Name
Improvement of the Water Conveyance System from Aqeb Well Field – Stage 2.2
Owner
Water Authority of Jordan-WAJ.
Consultant
GITEC Consult GMBH.
Project Period
462 days.
Description of Works
supply and installation of 13.8 km of ductile cast iron pipeline in diameter DN-600 mm and 300 min ON 400 mm and to connect it to existing and new pipeline sections including all valves, fittings and construction of chambers forinterconnection, air valves, and washouts; construction of a storage reservoir of 4000 m3 capacity, a chlorinating station;replacement of well connection pipelines and water meters and supply and installation of a SCADA system.