+962 79 8255534 info@deraya-group.org

New Water Transmission on Pipe Line in Shidia Mine

Sep 2022

Project Name

New Water Transmission on Pipe Line in Shidia Mine.

Owner

JPMC- Jordan Phosphate Mines.

Consultant

Madi and Partners Consulting Engineers.

Project Period

360 days.

Description of Works

The works include Replacing 3 existing pumps, installing new sub- suction & discharge lines forthe pumps, installing a main push steel line with a diameter of 800 mm and connecting it to the new line and the existing line, installing two electric butterfly valves, 800 mm in diameter, to connect the existing line to the new line, Installation of a 10-ton electric crane, Replacing the operating panels with others (Variable Frequency Drive),install a new Switchgear panel in addition to Connect all equipment to the existing control system (SCADA System).