Project Name
Supply and installation 3rd high efficiency pump in Al-Muntazah pumping station.
Owner
Jordan Water Company-Miyahuna LLC.
Consultant
Jordan Water Company-Miyahuna LLC.
Project Period
6 months.
Description of Works
The work included the removal of the existing vertical turbine pump and the supply and installation of a new vertical split case pump with a capacity of 2000 m³/hr at a 71-meter head. A variable frequency drive (VFD) panel was installed, along with motorized butterfly and gate valves, an electromagnetic flow meter, and a check valve. Station piping made of material 1.4301, as well as pressure transmitters and gauges, were installed. Additionally, a new 2.5-ton split unit was installed in the electricalroom. The existing LV and MV panels were modified to accommodate the new components, control cables were transferred within the PLC panel, and the local SCADA system was upgraded. Civil works included demolishing the old pump foundation and constructing a new one, along with other structural modifications as pertenderrequirements.